Project:
Westerton Care Home
Sector:
Healthcare
Client:
CorraMore Construction
Project Background
BM Steel Fabrications manufactured and installed the structural steel package and all internal and external architectural metalwork. Despite delays to earlier phases, BM Steel was able to complete the steelwork ahead of schedule. Having worked with CorraMore on a number of previous projects, BM Steel Fabrications was selected as preferred subcontractor for this sensitive project on an occupied Care Home situated in a challenging site adjacent to a railway.
Key Points
- Structural steel
- 60 tonnes installed
- Internal balustrades
- External railings
Customer Testimonial
"Due to the sensitive nature of this project, working along side a fully functional care home on a restricted site, it was essential for us to engage with a subcontractor who could handle to complexities of this build. Extremely poor ground conditions lead to an unforeseen delay. Mike and his team at BM Steel worked tirelessly to successfully pull this time back. Package included, structural steel, handrails and balustrading to new precast stairs. All completed ahead of schedule."